Punjab Yearly pathways closing routine for de-silting
Punjab Yearly pathways closing routine for de-silting
Lahore (Friday, Nov 22, 2013) – Punjab Watering Division on Saturday declared routine for annual closing of pathways during Rabi season 2013-14 for de-silting. According to the declared routine, pathways associated with Venture Control Workplace (PMO), Punjab Barrages, and the Thal Tunel, which off requires from Jinnah Onslaught and Reduced Chenab Tunel (except Jhang Branch) that comes out from Khanki Headwork, shall stay shut from Jan 13 to 30, 2014. It is relevant to bring up here that Punjab Watering department declared to shut these pathways every season for de-silting.
Schedule of Canals Closure 2013-2014
Lower Jhelum canal
Rasul Qadirabad Link
Qadirabad Balloki Link
Lower bari Doab Canal
Balloki Sulemanki Link
Uper Pakpattan Link
Eastern Sadiqia Canal
Upper Jhelum Canal
Lower Chenab Canal
Lower Chenab Tunel (Jhang Branch)
Upper bahawal Canal
Upper Chenab Canal
Central bari Doab Canal
Thal Canal
Trimmu Go Performs Canals
Trimmu Sidhnai Link
Sidhnai Canal
SMB Link
Lower Pakpattan Canal
Lower Bahawal Canal
Panjnad Canals
Taunsa Canals

0 comments: