Punjab Yearly pathways closing routine for de-silting

Punjab Yearly pathways closing routine for de-silting
Punjab Irrigation Department Logo

Lahore (Friday, Nov 22, 2013) – Punjab Watering Division on Saturday declared routine for annual closing of pathways during Rabi season 2013-14 for de-silting. According to the declared routine, pathways associated with Venture Control Workplace (PMO), Punjab Barrages, and the Thal Tunel, which off requires from Jinnah Onslaught and Reduced Chenab Tunel (except Jhang Branch) that comes out from Khanki Headwork, shall stay shut from Jan 13 to 30, 2014. It is relevant to bring up here that Punjab Watering department declared to shut these pathways every season for de-silting.


Schedule of Canals Closure 2013-2014
Punjab Canals Closure Programme During Rabi 2013-2014
Lower Jhelum canal

Rasul Qadirabad Link

Qadirabad Balloki Link

Lower bari Doab Canal

Balloki Sulemanki Link

Uper Pakpattan Link

Eastern Sadiqia Canal

Upper Jhelum Canal

Lower Chenab Canal

Lower Chenab Tunel (Jhang Branch)

Upper bahawal Canal

Upper Chenab Canal

Central bari Doab Canal

Thal Canal

Trimmu Go Performs Canals

Trimmu Sidhnai Link

Sidhnai Canal

SMB Link

Lower Pakpattan Canal

Lower Bahawal Canal

Panjnad Canals

Taunsa Canals




0 comments: